Horizontal Bag Shelf Optional Assembly

Use the unit rendering to determine the number and installation location for the Horizontal Bag Shelf optional installation.

  1. Install the spacers onto the tube weldments using the M10 hex bolt and flat washer.
  2. Install the tube weldment onto the removable horizontal rack. Slide the tube weldment with spacers through the slot in the removable horizontal rack and secure using the flange, and M10 hex key bolt. fasteners.

ID Qty PN Description
1 4 Q40534-101 ASSY, RACK, BAG RACK
2 16 Q2082 Horizontal Removable Rack
3 16 CWTEKN010-025 SCREW,BHC,M10X1.5X25,STL,BZ
4 16 CWWKKN010-020 WASHER, FLAT, STEEL, METRIC, M10 X 2 MM THICK, BZ
5 4 Q40385-101 FLANGE,2 HOLED,BAG RACK
6 8 Q40042-101 SPACER,TAPPED,M10-1.5

  1. Install the assembled horizontal bag shelf onto the unit. Use the rendering to determine installation location.

See Also

Install the Unit Optionals

Bulgarian Bag and Ball Optional Assembly

Horizontal VIPR & Roller Shelf Optional Assembly

 

Contact Precor Customer Support (Ph 800.786.8404) with any questions.

Copyright (Undefined variable: ProductInfo.Copyright)